Special beam for slabs in prefabricated and reinforced concrete and hollow tiles

The Special beam was designed to maximize the use of building materials on site, and to speed up the formwork and dismantling phases for slabs in prefabricated or reinforced concrete and hollow tiles.

Positioned above the upper head of T2C, it allows the support of the structure after an early dismantling within 4 days of casting. Thanks to the T2C delayed fall mechanism, the Special beam remains in support of the structure for the necessary time and guarantees shorter construction times compared to conventional systems.

The Special beam is currently combinable with the MULTIFORM and MULTIDECK systems.

Thanks to the Special beam above the upper head of T2C, the systems become formwork for slabs in prefabricated and reinforced concrete and hollow tiles, maintaining a simple and intuitive configuration.