Lowering Formwork: middle and perimeter beam

Thanks to the BMATEK lowering system, it is possible to easily reinforce lowered and middle beams for both reinforced concrete and reinforced concrete and hollow tiles.

It speeds up the assembly of the formwork, avoiding the shoring of the lowered beams.

By placing the H20 wooden beams in the lowering hooks, the formwork can be configured for:

  • Cantilevered slabs
  • Middle lowered beams
  • Lowered perimeter beams

The BMATEK lowering hook can be combined with all our Slab formwork systems.

Date:
BMATEK

Contact our Team.

CALL US NOW
+39 0376 1502580